
- 8
- 11.09.2023 07:55:00
- 1 min read
From September 10 to October 5, Muqimi Street, Chilonzor District, Tashkent city was partially blocked. "Veolia Energy Tashkent" company announced that "as part of the preparation for the heating season, the works of laying network pipelines along Muqimiy street of Chilonzor district have started." It is noted that, in addition to relocating pipes (each with a diameter of 700 mm and a total length of 1 km), valves and some equipment will be replaced. The work is carried out without limiting the supply of hot water to consumers. The lack of hot water on Mukimi Street on September 11-15 is due to the planned stoppage of "Tashkent IEM".
Source: khabar.uz