From May 22 to May 25, the road will be partially blocked in the Boom Gorge

From May 22 to May 25, the road will be partially blocked in the Boom Gorge
  • 6
  • 18.05.2023 15:41:00
  • 1 min read

"Kyrgyz temir jolu" asks the people of Kyrgyzstan to plan their routes.

From May 22 to May 25 (excluding weather conditions) on the 132nd kilometer of the Bishkek-Naryn-Torugart highway in the Boom Gorge (3,902th kilometer of the railway), work will be carried out to lower dangerous stones. This was reported by the press service of "Kyrgyz temir jolu".

The work will be carried out after the partial blocking of the road by traffic police officers from 9:00 to 15:00.
"During the cleaning of the road, transport will be directed along one lane. If more than 30-40 vehicles accumulate, the descent of stones will stop to let the cars through. Please plan the routes of movement by car," the message says.

Source: ru.sputnik.kg

Copyrights © 2026 All Rights Reserved by Casia News